Our News

Overview of All Pending Orders at a Machine

Knowing the next upcoming orders on a machine is an advantage in order to prepare the appropriate material or tool in time.
However, simulation as well as detailed and sequence planning of the orders often takes place with so-called APS tools in the corresponding specialist department.
On the store floor, on the other hand, the visualization of the planning result is often missing.
Cosmino MES and PDA therefore includes as a new feature an interface that displays the production orders imported from an ERP system or a planning tool for each machine, sorted chronologically according to the planned start date. If a parts list exists for the order, it can also be called up from the overview. The new interface can also be linked to already used Cosmino dialogs such as the factory overview or the Cosmino WorkerPoint data acquisition dialog. This will be available from the next major release in May.

 
Fig.: Interface for displaying pending orders for a machine, sorted by planned start date. When linking the navigation entry from other Cosmino interfaces, a filter value can be set automatically.
COSMINO AG hat 4,49 von 5 Sternen 14 Bewertungen auf ProvenExpert.com